Mezzanine from CFS (LGSF)

Hotline:
Call us, we are working now
During 1 minute

Find out the cost and terms of installation of your object from cold steel frame

Answer the questions and get:

Preliminary calculation +

the catalog of ready solutions

3D visualization as a gift

* after the conclusion of the contract





Quick construction of your building =fast return on investment

We offer the delivery of the frame, as well as the installation of mezzanine floors built from cold steel frame in just 2 weeks Mezzanine from CFS is a new stage in the evolution of construction

icon

Cheaper than hot rolled steel, no welding work.

Also, the absence of construction waste, a transparent estimate - all this allows you to significantly save money

icon

Fast construction time

A team of 3 people realizes the installation of a built-in room of 300 m2 in 1 week

icon

Durability
and reliability

The service life of the cold steel frame, due to its properties, is approximately 100-150 years

Hot deals 🔥

Just choose your project and we’ve calculate it for you now !


We offer 2 options
for cooperation

Turnkey construction

We build your premises
completely turnkey

It includes:
  • 3D visualization as a gift
  • We undertake the purchase of materials
  • The construction of the frame and thermal insulation
  • Separate guarantee for each stage of construction
  • Free warranty repair
Self-construction

We produce a kit of cold steel frame
for self-assembly

It includes:
  • 3D visualization as a gift
  • Cold steel frame ready to installation
  • Detailed assembly instructions
  • Installation support

Answer the questions and get a quote

the catalog of projects also

Total area: {math_result} m2

50
from 50m2
to 1500 m2

Licenses and certificates

License
Approval LGSF
Approval LGSF
DESCRIPTION


callback